Run Two Clients in Sync.
Hi Team, I have requirement like I need to do performance testing for 2 operations/clients. Issue is Operation A has dependency on Operation B. first I need to run Operation A then Operation B -- Valid Sequence. But Loadtest simply firing Operation A multiple times without any sequence with Operation B which causing…
-
is it possible to run Load Test with Environment Manager or any mode of Continuous Integration?
Hi Team, There is a situation where i have to run the loadtest as soon as the development build is pushed. is there any ctp option to run the loadtest by schedule. I don't see CLI version for loadtest. Regards Udaya
Popular Tags
- SOAtest 454
- legacy 440
- Virtualize 207
- C/C++test 179
- scripting 106
- .parasoft 82
- unit testing 64
- Parasoft Virtualize 61
- Announcement 61
- static analysis 58
- jtest 57
- dotTEST 48
- assertions 47
- C++ test 43
- API Testing 39
- cli 38
- automation 37
- data source 37
- xpath 35
- java 33
- reporting 33
- LoadTest 32
- SOAtest Virtualize 32
- ctp 30
- JSON 29