Skipping test case or dbtool

jngojngo
jngojngo Posts: 46

I got a scenario where there’s a chain of 3 test. First 2 are payload and the last is a dbtool call. Based on the reponse of the first test. I will either run the remaining two test or skipped them entirely. My question is how can I skip those remaining two test case.